Referenced-Workload Handling (on-demand)
Read this when the user provides something that already EXISTS — a live Azure resource / resource
group / subscription, IaC (Bicep/Terraform/ARM) or an infra plan, or a general doc describing current
infrastructure/requirements. If the input is purely NEW requirements with nothing existing, it's
greenfield — ignore this file and run the normal phases.
The switched-up flow (referenced mode)
- Confirm it's referenced. Does anything already exist (a resource group/subscription, IaC/plan, or
a doc describing current resources)? If yes, use this flow.
- Inventory the existing resources from whatever was provided. Capture a COMPLETE inventory — every
resource type, plus topology/relationships (VNet/subnet, private endpoints, identity bindings) and key
configurations (SKU/tier, TLS version, public-access setting, region). Do not omit resources or invent
ones that are not present:
- Resource group / subscription → introspect (
az resource list / az graph query) → real
resources with resource IDs.
- IaC / infra plan (Bicep/Terraform/ARM,
infrastructure-plan.json, terraform show -json) →
parse resource / existing / data blocks → logical resources.
- General doc → extract any existing resources it mentions.
- Gather insights from ALL provided context. Mine every input the user gave — docs, IaC comments,
resource tags, requirements, naming conventions, region, resiliency tier, PADU/preferences, cost and
compliance constraints — and record them as insights (the same channel Phase 3 already applies).
These shape the new workload just like tenant insights do.
- Surface them and ask which to incorporate. Present the existing resources you found and ask which
ones to incorporate (reference + wire) into the new workload. Recommend a sensible default —
incorporate the ones the new workload clearly depends on; never recreate them.
- Generate the complete IaC incorporating the chosen (or recommended-default) existing resources:
reference them (
existing / data, real ID for live, a param otherwise) and wire the new
resources to them, honoring the gathered insights. Never emit a new resource for something that
already exists.
Answer-first (ask AND generate — never stall)
Open with a plain-language summary of the existing infrastructure you inventoried and the additive
change you understood, then an explicit confirmation checkpoint ("Confirm this understanding before I
proceed to deploy"), and then generate the complete, deployable IaC in the SAME response using the
recommended default. Order within the turn: (1) summary of what exists + what you'll add, (2) explicit
"confirm before I proceed" gate, (3) the generated IaC, (4) the "which to incorporate?" choice and any
assumptions. Never end a turn with only a summary or a question, and never deploy before the user
confirms. If you lack a value (region, an existing resource's ID/name), declare a parameter and
proceed. The confirmation gate governs deployment (Phase 7), not whether you generate the plan/IaC —
you always generate; you never deploy without an explicit, risk-acknowledged go-ahead.
Inputs (three shapes → one normalized inventory)
| Shape | Inputs | Referencing precision |
|---|
| Actual state | a live Azure resource, resource group, or subscription | real resource IDs → reference exactly (existing/data) |
| Declared state | Bicep / Terraform / ARM, or an infra plan (infrastructure-plan.json, terraform show -json) | logical → reference by parameter (or build, if it's a spec) |
| Requirements/context | any general doc with info/requirements the user wants | mine for requirements + any existing-resource mentions |
Inputs can combine (e.g. a resource group + a requirements doc). If a declared file is ambiguous
("reference existing vs. build new?"), make the most likely assumption, state it, and generate — ask at
most one question, after the code.
For each existing resource, assign a ROLE (the "if needed" filter)
- Reference + integrate — the new workload depends on it → reference it AND wire it in:
RBAC role assignment, diagnostics → existing Log Analytics, private endpoints into the existing
VNet/subnet, secrets from the existing Key Vault, connection to the existing Event Hubs, use the
existing managed identity, etc.
- Retain — keep, must not recreate, nothing new connects → leave it; note "retained, out of scope".
- Ignore — irrelevant → omit.
Never emit a new resource for a resource that already exists. Reference it.
Deploy (referenced mode)
Referenced mode does not skip Phase 7 — the deliverable is deployed new infrastructure that
integrates with what already exists. Run phases/7-deploy.md with these guardrails:
- Same destructive-action gate. Present the risks and require an explicit, risk-acknowledged
"deploy" reply sent after the risks are shown. The original prompt never satisfies the gate.
- Additive only. The deployment must add the new resources and their wiring. The referenced
resources are declared as
existing/data (not resource), so a normal deploy never touches them.
- Incremental mode, never Complete. For Bicep use the default incremental mode — never
--mode Complete (it would delete resources absent from the template, including the referenced ones).
For Terraform, the referenced resources are data sources / imported, so apply must show no
destroy against them — abort if the plan proposes destroying or replacing a referenced resource.
- Preview first. Always run
az deployment ... --what-if (Bicep) or terraform plan (Terraform)
and confirm the diff only creates new resources and modifies nothing on the referenced ones before
applying.
- Deploy into the existing scope when integrating. Target the referenced resource group/subscription
so RBAC, private endpoints, and diagnostics wire into the existing resources.
How this rides the existing phases
- Phase 1: normalize the reference into
insights.json — existing resources (real ID or param),
must_not_recreate, integration points, requirements, tier.
- Phase 3: existing "apply insights" logic assigns roles and picks references over new resources.
- Phase 5: verify — (a) no duplicate of an existing resource; (b) every declared dependency on an
existing resource is actually wired; (c) cross-module
outputs.X you consume is declared by that
module (prevents BCP053); (d) source unmodified.
- Phase 6: emit new resources (secure-by-default) +
existing/data references + the wiring.
Real ID inline for actual-state; a param for declared/doc inputs.
- Phase 7: DO NOT skip deploy — run Phase 7 like greenfield, honoring the destructive-action gate.
The difference is scope: deploy only the new resources and their wiring; never modify, recreate,
or destroy the referenced/existing resources. See "Deploy (referenced mode)" below.
Secure-by-default (Phase 6)
Private endpoints + publicNetworkAccess: Disabled on data services; managed identity over keys;
storage allowSharedKeyAccess: false; Key Vault soft-delete + purge protection; AKS managed identity +
disable local accounts; minimum TLS 1.2.